J/24 “151” Swept under the aerial Lift Bridge in Duluth Mn after a big wind shift and accompanying seiche. Wind was 5-8 SW and instantly shifted to 35+ NE. These guys had the chute up going out into the lake and scraped it down in time to get pushed back into the bridge. Nobody was injured, except a mast-size dent in the rum budget.
Leave a reply